Dispatch route with paired 1.10 goods and speed factors, fixed Forecast terms, and refill-inclusive cycle comparisons.

River Dispatch

River Dispatch is the River route in Dispatch, formerly called River Run. It pairs a 1.10 goods factor with a 1.10 speed factor, making it a scheduling alternative to Road Dispatch.

Availability
Level 18 Dispatch.
Goods factor
1.10.
Speed factor
1.10.
Forecast
Displayed before acceptance and fixed for the accepted route.
Active-job limit
One Dispatch shared with Road and Aerial.

Route terms

River displays its accepted goods, duration, reward, and Forecast before the route begins. A River Forecast can require 10% more goods with a 1.10 speed factor; the factor is not a fixed 10% reduction in the displayed duration.

Cycle time

River is compared through the complete cycle of travel and input replacement. One published example uses 11 Trail Mix and 36 minutes for River against 10 Trail Mix and 40 minutes for Road. With four minutes required to replace each Trail Mix bundle, both routes take about 80 minutes for the same reward.

River shares the single active Dispatch with Road and Aerial Dispatch, so another route begins after the current result is collected.

History

River Run is the former name retained by the River Dispatch entry.

© Noah Encke