Translations from earlier Dispatch terminology to the current Dispatch Desk, Road, River, Aerial, Load Check, and Civic Forecast Board.

Dispatch History

Dispatch History translates route terminology from earlier Rodent Farm versions into the current Dispatch system. The present system offers Road, River, and Aerial deliveries, Load Check staging, and the Civic Forecast Board.

Dispatch unlock
Level 18.
Active job limit
One dispatch at a time.
Current routes
Road, River, and Aerial.
Route factors
Road 1.00 goods/1.00 speed; River 1.10/1.10; Aerial 1.25/1.25.
Value rule
Routes target equal expected value after refill time; community testing expects roughly 3% parity after conversion.

Translations

Historic labelCurrent meaning
MapDispatch
River RunRiver Dispatch
CraneLoad Check
RocketAerial Dispatch presentation
WeatherCivic Forecast Board

Current Dispatch

Dispatch shows its input goods, duration, reward, and current Forecast before acceptance. Road is the baseline route with 1.00 goods and speed factors. River uses 1.10 goods and speed factors, while Aerial uses 1.25 factors. The routes target comparable value when refill time is included in the comparison.

Load Check and Forecast

Load Check carries forward the staging role of the Hook-and-Haul Crane by manually staging an eligible completed batch. The Civic Forecast Board explains a route condition before acceptance, and its effect remains fixed for that delivery. Aerial is presented through the Rocket Post after the Acorn Space Program.

© Noah Encke